This recently completed project included new sub main and clean earth supplies to the existing IT Server room. The design and installation of a UPS system to support the existing IT infrastructure. Repositioning of the existing fibre cabling and terminating new patch panels. New containment has been introduced throughout the kitchen, shop and office environments to allow for the rewiring of all network outlets. Additional air conditioning supplies have been installed to accommodate the increased IT cooling demands.
All works had to take place whilst the garden remained open to the public requiring our team to work closely with RHS Garden Rosemoor management, to ensure Garden operations remained fully operational at all times. This resulted in a large proportion of works being carried out, as out of hours. Including the final overnight services change over to assist the RHS IT department.
The project was completed without any delays to contract, inconvenience or disruption to the client. All work was completed on budget.
"I have worked closely with Lektron on several server room installations and other projects for a number of years now. Their work is professional, competent and cost effective. They have provided the RHS a prompt and excellent service and i look foward to continuing our relationship with them for future projects."
Matthew Scouller
Network Analyst, RHS