Completed within six weeks, this 4 storey office block was converted to educational facilities for Surbiton Girls School. The £130 k project which consisted of completely rewiring the sub main distribution infastructure and providing part L metered distribution boards to each floor. A new LG3 compliant LED lighting system, designed and installed, incorporating emergency lighting design BS5266 requirements. Small power and network cabling installed throughout and contained within dado trunking. A complete new fire alarm system installed to the entire building incorporation class change facilities.
With an extremely tight project delivery date we had to work closely with the main contractor and our suppliers to ensure completion of all works before the start of the new term and class room requirements to ensure a smooth transition for the client.
The project was delivered on time and on budget prior to the start of the new term.
"Good stuff and by the way you did a great job at Sutherland you guys down there were brilliant so thank you."
Peter Seex
Ash Contracting Ltd